Resurfacing & Related Work Along Route 28

Cambridge-Somerville
$15M
MassDOT
Bridge ConstructionHighway ConstructionTransit/Rail ConstructionStructures Maintenance

Project Overview

Project Overview:

SPS New England is currently performing the following scopes of work along a 1-1/2 mile stretch of Route 28 between 3 rd Street in Cambridge and Broadway Street in Somerville: Bridge Deck, Scupper & Joint Repairs on Two Bridges over the MBTA Green Line & Keolis Commuter Rail; Reconstruction of Deteriorated Bridge Barrier; Curbing & Sidewalk Replacement to Provide A.D.A Compliance; Replacement of Pedestrian Handrail on Highland Avenue Bridge; Traffic Signal Modifications at 5 Intersections Along Route 28; Resurfacing of Bridges and Roadways Along Entire Project Limits; and Pavement Markings Along