SPS forces deployed within the Boston Common to perform repairs to the tunnel roof above the MBTA Boylston Station. The work included on-track shoring of the existing tunnel ceiling in coordination with the overhead power and catenary.
As part of the Green Line Surge project SPS headed up the effort to perform concrete repairs within the MBTA Copley Station.
Crews performed crack injection and leak sealing work along an inaccessible stretch of the isolated MBTA D-Branch and then the busy, confined historical downtown tunnel corridor. SPS continues to respond quickly to the call for transit infrastructure repairs.
SPS and Railroad Construction Company (RCC) crews completed over 2,000 feet of rail and tie replacement. In the station platform pit areas, the team completed concrete and rubber insert installations.