Newton Weston Bridge Bundle I-90 & I-95 Interchange

Newton & Weston, MA
$318,831,312
MassDOT
Marine FacilityDesign-BuildBridge ConstructionHighway Construction

Project Overview

Project Overview:

This Design Build project includes the replacement of the 1,020’ long, 4 span I-90 bridge over I-95 and the Charles River as well as 3 bridges in the ramp configuration. There are 2 additional superstructure replacements, including the I-90 bridge over the MBTA/CSX rail, and 3 bridges requiring rehabilitation.

This is a joint venture project with Walsh Group and our Design Partner is Jacobs Engineering.